![]() |
||
| Our Facility | About Us | Contact Us | Find A Dealer | Press Info | Trade Shows | Job Openings | |
|
Dual Dozer
When a job called for a 4 inch slab, and you poured mostly 4 1/2 to 5 inch slab you spent a lot of money on poor concrete yield. Don't pour a 5 inch floor when you need a 4 inch floor. Invest your hard earned money in a Dual Dozer, and stop wasting it on concrete and so many man hours of subgrade surface preparation you really don't need! Call 800-446-8222 for our free video showing the Dual Dozer at work doing subgrade surface prep in ONE-FIFTH the time of a crew with a skidloader, rakes and shovels, using string and pulling a 2 x 4 to confirm (maybe) grade!
To be competitive in the quality flat work business today, you need the Dual Dozer system. YOU KNOW that subgrade surface preparation is not only a major time and cost component of slab floor flat work, but it is also a key factor in concrete yields, slab fitness and ultimately slab performance.
Logos
Photos
Dual Dozer Blade
Dual Dozer Controls
Dual Dozer Front
Dual Dozer Quicktach
Dual Dozer Side
Dual Dozer Side 2
Dual Dozer Three Point Hitch
Electric Connection
Hydraulic Connection
Tractor Mounted Dual Dozer
Tractor Mounted Dual Dozer 2
For more information, please contact us.
HitchDoc 131 County Rd 34 E Jackson, MN 56143 1-800-446-8222 or 507-847-4049 |
|